Work List for  for V2.1  SAM : Scheduled Completion 8/15

Name Num Description Status Comp. Comments
Steve 9.1.3 lock/unlock data files on cache Not started    
    Design   7/22  
    Implementation   8/15  
9.1.5 Corba Utils Done   in prd
    Test with KAI 3.4   8/15  
9.1.7 Array inserts in db server Done   in prd
9.2   Project master restart  (general) Done    in prd
  "           "         "               (PM part) Done    
 "          "         "              (Station Master part)  Done???    
  "            "         "              (Sam Manager part) Not Done 8/15  Sinisa help
  "           "         "               (DB server part) Done???    
 Other  VLDB setup   7/18  
Other   Help install station on D0bbin? (with Sinisa)      
         
         
         
         
Julie 9.1.6 delete (change status)file script to mark status deleted (need discussion)      
  final design  rough draft    
  implementation   8/4  
nnn vldb tables and help      
         
9.6 Auto destination Started    
  Some Design work done (rich's document)      
    Changes to file_client.py  Started 7/21  
    Changes to meta-data?? (mc phase)      
  Testing   7/28  
         
         
         
         
Lee 9.1.8 vlpc support done    
23 vldb planning and scripting Underway    
   Event populate script  Testing 7/19  
   Performance monitoring   7/25  
   Query scripts   7/28  
         
         
         
         
Matt 3.29 Project def design 5+2 days done    
  Explored tools and apache server issues, servlets, etc.
put togehter prototype GUI last few days
 Done    
  Implement DB tables (in parallel w/ current def tables)
including query storing and cataloging
 Almost done    
formal grammer/ yacc file/parser (who????)      
  Python API   7/21  
  Command line interface (based on PyAPI) ideas      
  GUI   8/4  
         
         
       
       
Igor 9.3 Async  FSS       
   assync sam store and status inquiry   7/21  
   multi-stage file-cache  routing   7/28  
   python API for sam store       
  merge/split       
    design   8/4  
    metadata changes   8/11  
    new process type   8/11  
 new Status object definition Good for now    
9.1.4 FRH6.1 port and issues done    
         
         
         
         
Carmenita   Working on app for Status object & new fss w/ PyAPI      
  Orbacus on KAI 3.4 for OSF1      
         
       
       
       
Heidi/ 3.3 Farm File merge requirements close   needs d0 disc.
Macek(sp) 9.4 farm included in test harness (with sinisa)      
  revise farm scripts for more sam integration      
       
       
Jean  21.6.2 Ongoing support for data import as needed    
   update import doc to include new maint procs      
   improve import_tape scripts   7/21  
         
       
Sinisa              
9.1.1 Moving name service to ora1  Done    
9.1.2 Moving infoserver to ora1 (took 5 days not on WBS)      
    unit tests for info server (help from Lauri)      
 22 expanding test harness,      
  On-line included,  done    
  Farm w/ Majick not done 7/28  
  need stats for each test run not done    
  make running test harness part of sam shift (discuss)      
nnn farm d0bbin station master (discuss)w/Majick      
nnn SamManager work    7/28  
    test w/ FRH 6.1 and KAI 3.4 (someone else ??)      
    Restart project /w Steve      
nnn Orbacus on KAI 3.4 for FRH 6.1 and IRIX Done ?    
           
       
       
             
Lauri nnn Prepare unit tests for info server (w/ ex from Sinisa)   7/28  
    Integrate unit tests into status pages   8/4  
nnn Diagnose and fix "sam run project"       
nnn Help Matt with Gui for project def tools      
          
       
       
             
Derrick   enstore aml2-vol compare w/ vol-defined py script done    
   inventory files and duplicates   7/21  
  recover old mc unused tapes, and un-needed duplicates   8/4  
          
       
       
            
Vicky   Work on sam help document (sam-on-a-page, or sam --help)      
  Start design for resource management