Estimated work time in person days
| WBS | Descrip | Julie | Matt | Igor | Sinisa | Rich | Lee | Vicky | Steve | Heidi |
| 1.1 | Project Management/wbs | 1.5 | ||||||||
| 1.2 | Web Pages & document | 1 | 1 | 2 | 2 | |||||
| 1.7.8 | mini-review | 1 | 1 | |||||||
| 3.3 | Farm-file merge design | 3 | ||||||||
| 3.15 | MC import facility design | 1 | ||||||||
| 3.24 | System stats V1 design(part of) | 2 | ||||||||
| 3.28 | db server multi-connections-design | 3 | 1 | 1 | 1 | |||||
| 3.29 | Project definition extensions design | 1 | 1 | 1 | 1 | 1 | ||||
| 8.1 | V1 bug fixes/extensions | 1 | 2 | 2 | 2 | 2 | 1 | |||
| 8.2 | Project master features | 3 | 12 | |||||||
| 8.3 | Configure for startup | 2 | 1 | |||||||
| 8.4 | FSS features | 24 | ||||||||
| 8.5 | see 3.29 | |||||||||
| 8.6 | Station and cache | 2 | 4 | 21 | 4 | 5 | ||||
| 8.7 | Framework output file metadata | 6 | ||||||||
| 8.8 | MC card files | 3 | 7 | |||||||
| 21.1 | User group and training | 1 | 2 | 0.5 | ||||||
| 21.3 | Bug&tracking tool | 2 | ||||||||
| 21.6 | Operations | 1 | 1 | 1 | 1 | 1 | 2 | 1 | 1 | 1 |
| 22.15 | Testing plan | 1 | 4 | |||||||
| 22.16 | Test harness and stress tests | 4 | 3 | 6 | 17 | 5 | 1 | |||
| 22.17 | Database load/monitoring | 3 | 2 | |||||||
| Contingency | 1 | 4 | 1 | 1 | 2 | 2 | 1 | 1 | ||
| TOTALS | 15 | 34 | 37 | 37 | 37 | 11.5 | 11.5 | 15 | 7 |