Milestones and WBS
We have a WBS (somewhat non-standard )
- http://d0db-dev.fnal.gov/sam/cgi/wbs.py
WBS high level tasks for
- SAM Infrastructure and Project Management
- Requirements and Conceptual Designs
- Designs and Interfaces to other systems/products
- Data Organization and Content
- Demonstration Prototype
- V0 Working Prototype SAM
- V1 Limited Functinality SAM
- V2 Fully Functional SAM
- Test Systems and Software - procure and install
- Error Handling, Access Control and Authentication
- Operations including import of Run I data
- Tests, simulations and integration
work with detailed tasklists and total FTE-day estimates at a level one below the WBS tasks